Trinity Systems
HOME
EXPERIENCE
CONTACT
Trinity Systems
HOME
EXPERIENCE
CONTACT
More
  • HOME
  • EXPERIENCE
  • CONTACT
  • HOME
  • EXPERIENCE
  • CONTACT

project experience

Trinity has completed a variety of engineering and commissioning projects including:

Charles Drew Middle School HVAC Upgrade

Charles Drew Middle School HVAC Upgrade

Charles Drew Middle School HVAC Upgrade

Commissioning of critical HVAC repair and replacement project for two classroom buildings totaling about

60,000 SQFT

Griffith Middle School HVAC Upgrade

Charles Drew Middle School HVAC Upgrade

Charles Drew Middle School HVAC Upgrade

Commissioning of HVAC repair and replacement project for various classrooms, physical education buildings, and kitchens.  Commission all  systems including DDC controls, dampers, VFDs, and any other appurtenances as required for a complete energy efficient and easily maintainable HVAC system; fully operational including abatement, structural, mechanical, electrical, and fire alarm revisions; and historical buildings compliance  

Venice High School

Charles Drew Middle School HVAC Upgrade

Pacific Palisades Elementary School

 Architectural and engineering design services for the Renovation/Replacement of HVAC system throughout the entire campus. Our responsibilities included, but were not limited to field investigation and coordination of existing conditions with new design requirements, evaluation and  assessment of structural conditions of the areas affected by the new work and preparation of related architectural, structural, mechanical, and electrical construction documents. 

Pacific Palisades Elementary School

Pacific Palisades Elementary School

Pacific Palisades Elementary School

Mechanical and Electrical Engineering Services for renovation and 

replacement of HVAC systems 

throughout the entire campus 

and modernization projects. 

Canfield Elementary School

Pacific Palisades Elementary School

Palisades Charter High School

Commissioning of HVAC upgrade including admin and classroom buildings and kitchen. 

Palisades Charter High School

Pacific Palisades Elementary School

Palisades Charter High School

Commissioning of HVAC repair and replacement project for various classrooms, physical education buildings, and kitchens. 

San Fernando High School

San Fernando High School

San Fernando High School

 

Responsible for conducting electrical evaluations, structural evaluations, mechanical evaluation analysis and electrical design to provide electrical power for all new HVAC equipment associated with the COPS program in the gymnasium. In addition, structural details 

were designed for mounting the new HVAC units in accordance with current applicable codes,  industry standards and LAUSD special requirements. Structural evaluations were conducted to provide proper instructions to contractor for mounting of the new equipment in the existing gymnasium. This project required coordination with district personnel, site investigation, survey of existing conditions, evaluation, reporting, and  preparation of construction drawings. 

Embassy Suites Hotel

San Fernando High School

San Fernando High School

 Our responsibilities included but were not limited to field investigations to determine existing architectural and infrastructure conditions, coordination and interfacing with existing mechanical system, elevator recall, PA system, sprinkler system (FS/TS, PIV), kitchen Ansul systems, and any other applicable existing auxiliary systems; the detection system included full area coverage with smoke detectors in every room, and heat detectors in combustible accessible attic spaces, and the annunciation or notification portion included audible and visual devices in accordance with applicable codes and standards, and in compliance with city ordinances and the Building Department.   

Copyright © 2024 Trinity Systems - All Rights Reserved.


This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept